Henning Wolter Posted January 10, 2015 Share Posted January 10, 2015 hello This is my project Benchair It is a gaming chair and it can be moved with motors all parts. He has a volume of water cooling with 6 L. He weighs 176 kg The frame is made of steel tubing and sheet metal cladding of aluminum Here are the 3D Modles Then the first parts come Link to comment Share on other sites More sharing options...
Henning Wolter Posted January 10, 2015 Author Share Posted January 10, 2015 Then i startet with the monitormount It is made of steel and CrNi Steel Cut the single parts And weld sn screw is together with electric motors At home i soldet the controlboard for the electric motors and cabeling everything together Here the clips Monitor Mount Front Monitor Mount Side Link to comment Share on other sites More sharing options...
Henning Wolter Posted January 10, 2015 Author Share Posted January 10, 2015 Next i build the frame. 1. the base Then the backframe Then the roll bar Link to comment Share on other sites More sharing options...
Henning Wolter Posted January 10, 2015 Author Share Posted January 10, 2015 The reserve tank I built from a stainless steel tube. Next, a test build of the water cooling The armrests were of course also motorized. Then the trim was on the series Link to comment Share on other sites More sharing options...
Henning Wolter Posted January 10, 2015 Author Share Posted January 10, 2015 The hardware then took his place Now comes the current state of the project. Last weekend I made ​​the armrests and the foldable desk. Link to comment Share on other sites More sharing options...
Mike Petereyns Posted January 10, 2015 Share Posted January 10, 2015 DAMM Brutal build bro ! I love metal work modding (y) Link to comment Share on other sites More sharing options...
Alvin Porras Posted January 10, 2015 Share Posted January 10, 2015 Link to comment Share on other sites More sharing options...
-=SpH!Nx=- Posted January 12, 2015 Share Posted January 12, 2015 Ow man! Looking forward to seeing the finished build on this! This is amazing! With a triple monitor set-up, this thing is gonna be bada*s!! Link to comment Share on other sites More sharing options...
Henning Wolter Posted January 13, 2015 Author Share Posted January 13, 2015 Thx Guys Then i started with the control panel in the rollbar. At home i began with the cabeling of the engine control an power supply. At the end of the project there will be over 300m cable in the Chair Thats it for today Link to comment Share on other sites More sharing options...
Henning Wolter Posted January 18, 2015 Author Share Posted January 18, 2015 Next, I continued to work on the sheet metal cladding Then we went on with the wiring of the motors an the controlboard Control before sleeving and after Next, I have everything assembled and connected in the roll bar Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.