SHI MIN Posted June 2, 2016 Author Share Posted June 2, 2016 Link to comment Share on other sites More sharing options...
SHI MIN Posted June 12, 2016 Author Share Posted June 12, 2016 top-level design bolster This is attached to the bore a hole 3mm use CARBON Sticker Link to comment Share on other sites More sharing options...
SHI MIN Posted June 12, 2016 Author Share Posted June 12, 2016 Waiting for a long time DC Putter point of application on one side Structural reinforcement,increase in aluminum scroll saw processing Retention needed portion Confirm a fixed position bore a hole fixed Link to comment Share on other sites More sharing options...
SHI MIN Posted June 12, 2016 Author Share Posted June 12, 2016 Putter bracing frame excision bore a hole fixed \ Link to comment Share on other sites More sharing options...
SHI MIN Posted June 12, 2016 Author Share Posted June 12, 2016 Spray painting Silver Spray painting Silver gray sanding Spray painting black Link to comment Share on other sites More sharing options...
SHI MIN Posted June 12, 2016 Author Share Posted June 12, 2016 DC Putter control PCB DIY Provides six 3PIN ,Let other peripheral use Switch fixed Control opening and closing Link to comment Share on other sites More sharing options...
SHI MIN Posted June 12, 2016 Author Share Posted June 12, 2016 Test waterway https://youtu.be/-qZ6RJdnVl4 DC Putter control test https://youtu.be/DRSlrGHn8sI https://youtu.be/YXE-21-zttU Link to comment Share on other sites More sharing options...
SHI MIN Posted June 12, 2016 Author Share Posted June 12, 2016 prop up seat processing Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.