HybridChiller Posted March 3, 2011 Author Share Posted March 3, 2011 here some show pics,the effect of the custom mounting is now nice visible, while i'm busy with all the cable management : Link to comment Share on other sites More sharing options...
HybridChiller Posted March 3, 2011 Author Share Posted March 3, 2011 small update: tubing is almost ready just need 3th pump, a koolance PMP-400 with acetal top, and building a drainvavle beneath. then it's all ready just need memory dom GT 2000Mhz 12gb Triple kits. enjoy the pics because it's closing up this build, just few mods and it's ready : little teaser, what am i planning to do ? the bottom is as good as finished, just need to order a flat pump with top... if a Koolanc PMP-400 pump with top is maximum 40mm heigh. I can take the bottom out any time it's a tight fit and is on 2 alu plates, nice and steady. The usb internal, sata and ECP connector on the mobo is nice clean now. This is no metal plate but 4mm not shiny black acryl plate PMMA15 only needs to get connectors for the PciE powercables for the GPU's : after the drain valve needs also a exit for the liquid : little update : Make the led's for the full cover block on size to the fan connector on mobo what normally the fan is for the NB cooling. Next i'm modding the powercables for the vga's : Link to comment Share on other sites More sharing options...
HybridChiller Posted March 3, 2011 Author Share Posted March 3, 2011 i'm busy on a little mod for the memory, lasered alu, and some handwork, need base and color paint : better pic of GT mod : today had some fun to make some more Dominator GT flames for my memory : Link to comment Share on other sites More sharing options...
Rudieman Posted March 3, 2011 Share Posted March 3, 2011 I'm not sure if I find this an improvement for this particular case, I will have to see when its finished but I do love the custom "engine block" you build Link to comment Share on other sites More sharing options...
HybridChiller Posted March 9, 2011 Author Share Posted March 9, 2011 small update, got at last the snake connector in, so the 3th pump can be fitted and the loop closed, ready to fill it up. left of the pump you see all kind of cables , that's for the Koolanc TMS-200 controller, all kinds of temp sensors all around the mobo and cpu's. Link to comment Share on other sites More sharing options...
HybridChiller Posted March 10, 2011 Author Share Posted March 10, 2011 i'm going to fill up the loop now the 3th pump is installed, own mixture : 25% Ethylene Glycol and 75% PURE water, no demi. what you see in the measure cup is the Glycol no color pure 100% glycol : here my koolanc poor in cup on the ZERN res with a snake connector to make it a little bit eassier to fill : on the drain valve i putted also a tube in a bus filled with my mixture, where the pump can draw it's liquid from when i put the valve open, to make it a little bit eassier to lol : and here comes the first liquid lol, pumps are now running to get the last micro bubbles out the loop, for now, no leaks found : Link to comment Share on other sites More sharing options...
HybridChiller Posted March 11, 2011 Author Share Posted March 11, 2011 Link to comment Share on other sites More sharing options...
HybridChiller Posted March 12, 2011 Author Share Posted March 12, 2011 It's a miracle !!!! i get it closed hahahahaha, +200m cable in limited room of 3,5cm lol : here you see that the plate is a little round, but i put the cable fast fast in to look if i get it closed, later on the cable will be nice routed and strapped so that the plate doesn't look round : Link to comment Share on other sites More sharing options...
HybridChiller Posted March 13, 2011 Author Share Posted March 13, 2011 last minute adjustment for the vga's : Link to comment Share on other sites More sharing options...
HybridChiller Posted March 14, 2011 Author Share Posted March 14, 2011 little update : Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.