Jump to content

D0liveira

Members
  • Posts

    69
  • Joined

  • Last visited

Everything posted by D0liveira

  1. Here you can see the difference between the previous color and the final color. Previous: Final color:
  2. But my wife saw the finished painting and thought the color was too dark, and the project could be meaningless. So I had the decision to keep it as it was, or choose another shade of lighter gray. In my workshop I found 2 more shades of gray to decide. The chosen color was Scandium Gray Metallic. This paint has a Polyurethane base, but I did not use the varnish for the final finish and left the finish matte. It took 6 coats of paint throughout the craft to cover the dark color and to achieve a tone that really turned out as I had imagined in the project.
  3. Continuing, I come to the most important part of the process of creating the project, which is the painting, and after doing all the smoothing and finishing details, I chose the color and started painting...
  4. Before showing the painting process, I will share the attempt to make the base of the ship, which unfortunately was not successful and almost caused an accident with the project. I started the idea of supporting the ship by building the shock absorbers on top of a wooden base, and I was not successful. After that, with little time to make a decision and manage to solve the problem, I asked a friend to make a triangular base in steel Metalon, with support to screw the shock absorbers in a safer and more fixed way.
  5. After extensive sanding work to complete the finish, I applied what would be the last coat of universal basecoat and then prepared for the final painting.
  6. Continuing the process, I already put masking tape on the lid to mark the window cuts.
  7. During this entire finishing process, I used a universal primer to be able to find some imperfections and thus remove them.
  8. After all the cuts, I started roughing the ship to remove excess fiber, and after that, applying the polyester putty and sanding until I got the best finish. At this point the body was already used to so much itching because of the fiberglass. HAHAHA
  9. At this moment I marked the air passages for the 360mm radiator, source, rear panel of the MB and VGA. The cuts were made. We should always measure 3 times to be sure, and cut with absolute certainty after that.
  10. The top cover cleaning process took place at this time, so I leave the record that it was difficult and I needed the clean cover to measure the height of the hardware and other components.
  11. In this step, I preassembled the hardware and marked all the cuts and holes, and I had everything ready. I used the power of light on the fiber to identify the holes and access cut points. An old chassis was used to remove the mobo tray to receive our ZENITH EXTREME in the future.
  12. Here I carried out the internal cleaning of the ship, removing all the styrofoam that served as a structure for the lamination to be carried out. It was a difficult process but in a few hours it was completed.
  13. In this step, we start the lamination with catalyzed resin and fiberglass. Throughout the nave, 4 layers of fiber blanket were used, and at some points it was necessary to place the fifth layer to improve the structure. One of the big problems I faced was related to the result of working so many days with fiberglass, with regard to itching, and referring to the resin that made me very sick due to not having the appropriate mask equipment to use. I got sick after this process and couldn't work on the project for almost 3 weeks. Looking at the worklog up to this exact point, I am proud to have completed the project (as will be seen later), but I thought I would not finish it because when I was sick I thought I had COVID-19 and I was surprised with an anxiety attack that did not turn into depression because very little. Everything happened at once, but I had faith and little patience, I continued.
  14. In the next process, we use EPS resin (polyurethane) to cover the entire structure of the ship. This process is necessary as it guarantees that the Styrofoam piece will not fall apart when applying fiberglass resin with catalyst (solvent based).
  15. I had difficulties when gluing the styrofoam, because the glue alone did not work. Using the plastic straws I had more success. The modeling was very laborious, probably more than 40 hours were used to achieve the desired format. At this stage of the project I couldn't build and take pictures, so I recorded the whole process. The photos above are prints of the execution of this process so far. Styrofoam brings a long modeling capacity to any type of art, I really enjoyed using this material for large pieces. One experience I've had with this type of work was modeling car parts. A few years ago in Brazil, many cars were built in fiberglass and the process of creating many parts was through molds created in Styrofoam, as well as clay and other reusable materials.
  16. Hello everybody, Following the post, I will show how I idealized the project format and how I modeled it. To create the structure big enough to accommodate all the hardware I used a cardboard box, pencil, ruler and blade, in addition to the hardware pieces to measure and measure the space needed. To create the shape of the nave, I used styrofoam board used in civil construction, glue, plastic straws and a blade for modeling and cutting, as well as sandpaper to smooth the finish.
  17. Following updates, I will post all components of the computer. Cooler Master Brazil supports my project with the components: - PSU: CM G700 Gold - 80 Plus Gold; - WC: CM Masterliquid ML360 Mirror TR4; - Fan: Sickleflow 200 ARGB + Masterfan MF120R ARGB; The other components: - MB Asus Zenith Extreme TR4; - CPU AMD Threadripper 2990WX; - RAM 32GB DDR4 TeamGroup Tforce Delta RGB; - SSD HyperX Predator 500GB + SSD TeamGroup Carder II 256GB; - VGA Gigabyte G1 Gaming 1050 2GB; - LED Strip ARGB;
  18. Hi Brothers, I want to show you something really amazing that I'm creating right now. It's my FIRST SCRATCH PROJECT BUILD, as required by the script.=} The name of the project is SP4RCESHIP, which is the translation of "NAVE ESPACIAL". The 4R listed in the project name makes mention the four most important people in my life: Rosana (wife), Raquel, Rafaella and Rebecca (daughters). The project will be based on metrics, as follows: - Concept: Futuristic spaceship with upper window on canvas to show the “crew members”. The ship will move in a “landing” and “takeoff” motion, with ARGB(addressable RGB) light effects. The project color will be matte medium dark grey. The idea is to have the project in a horizontal position(about 40 degrees) and rest in a vertical position. - Size: The project as a whole will have a length between 60 and 70 centimeters, a total width of 35 to 45 centimeters and a height of 15 to 25 centimeters. These measurements will be defined when the hardware and equipment are assembled in the project. - Construction materials: MDF wood, Metalon(Steel), Gel Coat, Fiberglass, Acrylic, Styrofoam, aluminum screen. Below is a sketch of the design that will be the basis for building the project (sorry for the LoL design)
×
×
  • Create New...

Important Information

By using this site, you agree to our We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue..