Dave2010 Posted October 16, 2013 Author Share Posted October 16, 2013 I'm back! A small up waiting for the material from Bitspower. I threaded the supports for the pumps. As soon as I have in hand all the fittings will fasten to the bulkhead and I will link below the reservoir to compose the two loops. Next, I mounted two other fans Corsair SP120, such as those already received sponsor directly from Corsair, which I proceeded to stare at the back and in the area on the front, which I had prepared in the design phase of the panels in stainless steel. I moved a few inches the reservoir blue, slightly to the right, so I would say that is much better. Link to comment Share on other sites More sharing options...
Dave2010 Posted October 16, 2013 Author Share Posted October 16, 2013 Here the material finally arrived! Over the weekend we'll set to work! Link to comment Share on other sites More sharing options...
Dave2010 Posted October 16, 2013 Author Share Posted October 16, 2013 Here the EK top for the two Laing! Completed in the first loop, I still miss to position the Aquacomputer flow meter and filter. For the second loop you have to wait for the vga and its WB to complete the various links. Here are the top EK mounted. Both trays were spaced slightly from the bulkhead in which they are fixed, for convenience with the connection to the pump. I tapped M5 Both trays and spaced with the plexi. Bye! Link to comment Share on other sites More sharing options...
IVANICS Design Posted October 16, 2013 Share Posted October 16, 2013 Outstanding work! Link to comment Share on other sites More sharing options...
Dave2010 Posted October 17, 2013 Author Share Posted October 17, 2013 Thank you very much! Link to comment Share on other sites More sharing options...
Jim Weist Posted October 22, 2013 Share Posted October 22, 2013 awesome work bro! cheers! Link to comment Share on other sites More sharing options...
Dave2010 Posted October 24, 2013 Author Share Posted October 24, 2013 Thank you very much! Link to comment Share on other sites More sharing options...
Dave2010 Posted October 24, 2013 Author Share Posted October 24, 2013 And this is what happen when this persons... ...make a good job for me! Thank you very much for this sponsorship!! Link to comment Share on other sites More sharing options...
Dave2010 Posted October 28, 2013 Author Share Posted October 28, 2013 Good evening guys! I continue with the liquid cooling system. A little test of the psu and vga on the htpc. Mounting of the waterblock of VGA. I must cut a piece of the vga because it hurts the rear inox panel of the motherboard. And the now it comes the best. There's a little problem: the weight of the vga and its waterblock, is very high and the pci-ex connector can't only hold them. I have an idea: make a little steel bar to hold them. The steel bar was thread because I need to hold them to the panel. See you soon! Link to comment Share on other sites More sharing options...
Dave2010 Posted November 9, 2013 Author Share Posted November 9, 2013 Sleeving time!! Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.