AKMod Posted January 1, 2021 Author Share Posted January 1, 2021 Deconstruction table Perform detailed 3D drawing, which will include CNC, lathe, and laser cutting processing. The design progress is 100% completed,contains nearly 200 components! Link to comment Share on other sites More sharing options...
AKMod Posted January 2, 2021 Author Share Posted January 2, 2021 Test EL cold light strip I really like the effect! Link to comment Share on other sites More sharing options...
AKMod Posted January 4, 2021 Author Share Posted January 4, 2021 Test assembly Test component installation. There are still a lot of details, aging and cables to work! Link to comment Share on other sites More sharing options...
modLab Posted January 5, 2021 Share Posted January 5, 2021 I love it Link to comment Share on other sites More sharing options...
AKMod Posted January 5, 2021 Author Share Posted January 5, 2021 29 minutes ago, modLab said: I love it Thank you bro! Link to comment Share on other sites More sharing options...
AKMod Posted January 5, 2021 Author Share Posted January 5, 2021 Detail The first layer does the old processing work. After another detailed work is needed, the overall degradation effect can be processed. Water sticker work. Start welding aviation joints. Link to comment Share on other sites More sharing options...
AKMod Posted January 7, 2021 Author Share Posted January 7, 2021 Detail Some old details update. Mantis Blades and GPU are connected in series with hoses to create a concept that the machine is connecting the arm signal. Link to comment Share on other sites More sharing options...
AKMod Posted January 8, 2021 Author Share Posted January 8, 2021 Detail 90% of the processing progress of the aging effect, leaving the final overall washing stains. There is also the final stage of the detail degradation effect. The cable is almost complete! Link to comment Share on other sites More sharing options...
AKMod Posted January 9, 2021 Author Share Posted January 9, 2021 Cable Use aviation connectors for cable work, and want to express that the power of the work components is plugged into the maintenance table. Test some lighting effects. Power shield PCB board. Link to comment Share on other sites More sharing options...
AKMod Posted January 10, 2021 Author Share Posted January 10, 2021 Test assembly completed The progress is 90% completed, all cables are tested, and the final detail processing stage begins. Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.