GP Modder Posted November 8, 2020 Author Share Posted November 8, 2020 Link to comment Share on other sites More sharing options...
MonsterMawd Posted November 9, 2020 Share Posted November 9, 2020 lots of good fabrication Link to comment Share on other sites More sharing options...
Pine PC design Posted November 9, 2020 Share Posted November 9, 2020 First time reading through your worklog, and this looks so amazing! I really love the way you log and take the time to take us through the whole build progress. PS. Those aluminium/wood combinations make me drool!! Link to comment Share on other sites More sharing options...
GP Modder Posted November 10, 2020 Author Share Posted November 10, 2020 MonsterMawd Pine PC design, Thanks guys, I hope the end result will be convincing! I wish you good work guys, great finish! :) Link to comment Share on other sites More sharing options...
GP Modder Posted November 13, 2020 Author Share Posted November 13, 2020 Hello everybody! Modding work is going on in silence, in addition to daily work. The tree received light. Link to comment Share on other sites More sharing options...
GP Modder Posted November 14, 2020 Author Share Posted November 14, 2020 The painting is also done, the varnish on the wood is still drying, construction will start next week. Link to comment Share on other sites More sharing options...
GP Modder Posted November 16, 2020 Author Share Posted November 16, 2020 Varnishing doesn't usually work out at first. Bubbles, ditches, surface problems. re-sanding, refilling problem areas with a brush. long and dull work, but only so can the final varnish be beautiful if the foundation is perfect. Link to comment Share on other sites More sharing options...
GP Modder Posted November 16, 2020 Author Share Posted November 16, 2020 Link to comment Share on other sites More sharing options...
GP Modder Posted November 18, 2020 Author Share Posted November 18, 2020 The first filler layer was not enough. I polished it back today. Second filler layer, I hope it will finally be good. Link to comment Share on other sites More sharing options...
GP Modder Posted November 22, 2020 Author Share Posted November 22, 2020 Filling and sanding all wood cracks, 120-240-320-600-800-1200 steps. Ready. Varnishing in 2 steps next week: Base varnish. Varnishing. I hope it will be okay, there is still a lot of work left. Everything you need for the job! Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.